home *** CD-ROM | disk | FTP | other *** search
/ Shareware Overload Trio 2 / Shareware Overload Trio Volume 2 (Chestnut CD-ROM).ISO / dir27 / 9404xx.zip / 940405.SHU < prev    next >
Text File  |  1994-04-07  |  5KB  |  117 lines

  1.  
  2. KSC SHUTTLE STATUS REPORT 4/5/94
  3.  
  4.  _______________________________________________________________
  5. |       KENNEDY SPACE CENTER SPACE SHUTTLE STATUS REPORT        |
  6. |                     Tuesday, April 5, 1994                    |
  7. |                       LAUNCH MINUS 3 DAYS                     |
  8. |_______________________________________________________________|
  9.  
  10. KSC Contact: Bruce Buckingham         407-867-2468 (fax 867-2692)
  11.         _________________________________________________
  12.        |                                                 |
  13.        |  MISSION: STS-59 -- SPACE RADAR LABORATORY - 1  |
  14.        |_________________________________________________|
  15.  
  16. VEHICLE: Endeavour/OV-105              ORBITAL ALTITUDE: 138 sm
  17. LOCATION: Pad 39A                      INCLINATION: 57 degrees
  18. LAUNCH DATE: April 8                   CREW SIZE: 6
  19. LAUNCH TIME: 8:06 a.m. EDT             WINDOW: 2 hours/30 minutes
  20. KSC LANDING DATE/TIME: April 17/1:13 p.m.
  21. MISSION DURATION: 9 days/5 hours/7 minutes (+ 1 day)
  22.  
  23. NOTE: The countdown for mission STS-59 is currently holding at
  24. T-27 hours as a result of yesterday's decision by mission
  25. management to make additional inspections on Endeavour's three
  26. main engines. The decision to perform the borescope inspections
  27. on the engines, specifically the high pressure oxidizer turbo
  28. pumps, was as a result of engineers at Canoga Park, Calif.,
  29. discovering smaller than permittable vanes, or stationary guides,
  30. in the preburner that directs the flow of the liquid oxygen
  31. through the pump. Managers will be meeting again today to discuss
  32. the results of the inspections.
  33.  
  34.      Because of this decision, the launch of Endeavour was moved
  35. from Thursday to Friday, April 8. The two-and-half-hour window
  36. opens at 8:06 a.m. (Remaining in the schedule is the option to
  37. launch Endeavour as much as an hour earlier at 7:06 a.m. This
  38. alternative will be implemented the day prior to launch day if
  39. mission managers judge the weather may not be acceptable at 8:06
  40. but could be acceptable earlier.)
  41.  
  42.      The forecast indicates a 60 percent probability of weather
  43. prohibiting launch on Friday with the primary concerns being for
  44. low ceilings and winds exceeding runway crosswind limits. 
  45.  
  46. IN WORK TODAY:
  47. *  Countdown at T-27 hours and holding
  48. *  Continue inspections of main engine's high pressure oxidizer
  49.    turbo pumps
  50. *  Verification of shuttle power on system, data processing and
  51.    flight control systems
  52. *  Preparations to load onboard cryogenic reactants
  53. *  Awaiting final results from engine analysis
  54.  
  55. WORK SCHEDULED:
  56. *  Pyrotechnic initiator controller (PIC) tests
  57. *  Load cryogenic reactants into onboard power reactant storage
  58.    and distribution system tanks (8 a.m. Wednesday)
  59. *  Retract rotating service structure (11 a.m. Thursday)
  60. *  External tank loading operations (11:46 p.m. Thursday)
  61.  
  62.      _______________________________________________________
  63.     |                                                       |
  64.     |       SUMMARY OF HOLDS AND HOLD TIMES FOR STS-59      |
  65.     |_______________________________________________________|
  66.  
  67. T-TIME ------- LENGTH OF HOLD ---- HOLD BEGINS --- HOLD ENDS 
  68.  
  69. T-27 hours --- 28 hours --------- 3 am Tues.------ 7 am Wed.
  70. T-19 hours --- 4 hours ---------- 3 pm Wed.------- 7 pm Wed.
  71. T-11 hours --- 14 hrs.,46 mins. - 3 am Thurs.----- 5:46 pm Thurs.
  72. T-6 hours ---- 1 hour ---------- 10:46 pm Thurs.- 11:46 pm Thurs.
  73. T-3 hours ---- 2 hours ---------- 2:46 am Fri.---- 4:46 am Fri.
  74. T-20 minutes - 10 minutes ------- 7:26 am Fri.---- 7:36 am Fri.
  75. T-9 minutes -- 10 minutes ------- 7:47 am Fri.---- 7:57 am Fri.
  76.  
  77.             ________________________________________
  78.            |                                        |
  79.            |       CREW FOR MISSION FOR STS-59      |
  80.            |________________________________________|
  81.  
  82. Commander (CDR): Sidney M. Gutierrez (Red team)
  83. Pilot (PLT): Kevin P. Chilton (Red team)
  84. Mission Specialist (MS1): Jerome (Jay) Apt (Blue team)
  85. Mission Specialist (MS2): Michael R. (Rich) Clifford (Blue team)
  86. Mission Specialist (MS3): Linda M. Godwin (Red team)
  87. Mission Specialist (MS4): Thomas D. Jones (Blue team)
  88.  
  89.        __________________________________________________
  90.       |                                                  |
  91.       |   SUMMARY OF STS-59 LAUNCH DAY CREW ACTIVITIES   |
  92.       |__________________________________________________|
  93.  
  94. Thursday, April 7, 1994
  95.  
  96. 6:00 p.m.      Wake up (Blue team)
  97. 6:30 p.m.      Breakfast (Blue team)
  98. 6:30 p.m.      Sleep (Red team)
  99. 11:30 p.m.     Lunch (Blue team)
  100.  
  101. Friday, April 8, 1994
  102.  
  103. 2:30 a.m.      Wake up (Red team)
  104. 3:00 a.m.      Breakfast (Red team)
  105. 3:41 a.m.      Dinner (Blue team)
  106. 4:11 a.m.      Weather briefing (CDR, PLT, MS2)
  107. 4:11 a.m.      Don flight equipment (MS1, MS3, MS4)
  108. 4:21 a.m.      Don flight equipment (CDR, PLT, MS2)
  109. 4:51 a.m.      Depart for launch pad 39A
  110. 5:21 a.m.      Arrive at white room and begin ingress
  111. 6:36 a.m.      Close crew hatch
  112. 8:06 a.m.      Launch
  113.  
  114.                           #   #   #   #
  115. ---
  116.  ■ Via FTL BBS (404-292-8761) and NASA Spacelink (205-895-0028)
  117.